Creating Extra Space for Sports Facilities
During the Winter of 2020/2021 we were approached by a long–standing client in the education sector, to create additional space for students changing facilities and also training space.
It was vital that there was heating within the structure, so we installed a jumbo heater with 30m of internal ducting throughout and over 100m of PVC walls were installed to create individual rooms.
To offer some protection, and although not vital to the structure, we installed a sub-frame to the floor; this also provided extra stability to the long-term facilities.